Skip to content

Eichler Re-mod

2004 DIY budget-friendly remodel of an Eichler house in Sunnyvale, California

  • Before-and-after
  • Essentials
  • Disclaimer: this is not a restoration!
  • Colophon
  • Links

Day: June 8, 2004

  • Home
  • 2004
  • June
  • 8
bathroom2 before

First Impression (bathroom 2)

2004-06-082021-05-24 admin-eichler

The second bathroom is adjacent to the master bedroom. It has a peculiar design – the vanity is in the same space as a walk-in

Read More
bathroom1 before

First Impression (bathroom 1)

2004-06-082021-05-24 admin-eichler

Let’s have a look at the first bathroom now. The photos don’t quite reflect the state of that room. The aluminum window frame is punctured

Read More
before kitchen

First impression (kitchen)

2004-06-082021-05-24 admin-eichler

Let’s go inside. Everything had been carefully prepared for the sale with a gorgeous cream paint all over the house, and the infamous brown carpet.

Read More
backyard frontyard

First impression (outside)

2004-06-082021-05-24 admin-eichler

Here are the first photos of the outside of the house, taken during the open house organized by the real estate agent. How do you

Read More

Categories

Tags

0_before advice babble bathroom bathroom1 bathroom2 before-and-after books cabling cat6 coax demolition during eichler electrical entrance ethernet first_impression flooring floorplan frontyard fumigation garage garden kitchen landscaping laundry leak permits photos plants plumbing problem regulations roof roofing small_space soldering street tips tools trades urethane WFH working_from_home
All Rights Reserved 2021.
Proudly powered by WordPress | Theme: Fairy by Candid Themes.